Product Spotlight: Putzmeister Telebelt TB130
The Telebelt TB130 is designed for high-volume material placement, with an observed capacity of up to 4.25m³ per minute and…
The Telebelt TB130 is designed for high-volume material placement, with an observed capacity of up to 4.25m³ per minute and…
With vertical reaches of 50 metres and 62.1 metres, both five-section booms helped maintain controlled, continuous concrete placement throughout the…
Based at our Epping depot, Darren has worked as a concrete pump operator for 30 years, spending 27 of them…
A 20-metre boom pump supporting concrete placement for a new TfL maintenance depot, built to service London Underground trains as…
Well done to Richard Murphy, who has been nominated by the team at Joseph Gallagher Limited for a Best Practice…
Great to spend the day at the Construct Golf Day! It was fantastic to be part of an event supporting…
Camfaud Group exhibiting the brand-new Telebelt TB130 at Hillhead Show in Buxton. Come and visit us on Stand CE2, where Adrian…
Enabling works for a data centre using our Putzmeister M63. Big kit, smooth pour. #ThrowbackThursday #ConcretePumping #TBT #ConstructionLife #Putzmeister #CamfaudConcretePumps
We’re heading to the Hillhead Show from 23–25 June and can’t wait to be part of it. Come and see…
Great to get the Schwing M20 on site and delivering a smooth, efficient pour from start to finish. Always good…
Looking back at this great project where we used our Schwing M20 to pour shuttered walls for a new farm…
Powered by our Putzmeister M63 and 2 x Schwing M65’s. #ThrowbackThursday #Camfaud #Construction #Concrete #Slipform