Skip to main content

Get in Touch

A44 Concrete Pump Equipment Training

CPCS / NOCN
Intermediate
3 Days
2 locations

Who Should Attend

This course is tailored for:

  • Construction workers who have worked around concrete pump equipment
  • Site workers, foremen, and supervisors familiar with concrete operations
  • Individuals who have observed or assisted in concrete pumping but have not received formal training

Important: This course is intended for those with prior on-site construction experience. It is not suitable for beginners or those without exposure to concrete pumping environments.

What You’ll Learn

Participants will gain practical knowledge in:

  • Types of concrete pump equipment (A44 trailer-mounted units)
  • Safe site setup, traffic flow, and equipment positioning
  • Hazard identification and risk mitigation (e.g. blockage avoidance)
  • Operational responsibilities and communication signals
  • Preventative maintenance and emergency shutdown procedures
  • Environmental safety and post-operation clean-up

Course Duration

3 Days

  • Day 1: Classroom instruction + site safety basics
  • Day 2: Equipment familiarisation + practical hazard scenarios
  • Day 3: Hands-on demonstrations + assessment/theory test

Outcomes & Certification

By the end of this course, participants will be able to:

  • Progress to the CPCS onsite practical test (relevant to the category)
  • Confidently support and interact with concrete pump operations on-site
  • Identify safety hazards and enforce safety zones with control measures
  • Use clear communication with operators and site team
  • Follow compliance protocols and equipment guidelines

Certification: Participants will receive a CPCS/NOCN accreditation (trained CPCS card for relevant category), which may be used to meet site training requirements or employer safety standards.